TY-GARD 2000 Cargo Restraint System
Home Demo Installation Photos Loading Guide Contact Us Order Now

TY-GARD 2000 INSTALLATION

1 2 3 4 5
 
 
Pull the TY-GARD 2000 strips across the face of the load overlapping ends at least 1 ft (15cm). Cut excess if necessary.

 
 
If the video does not appear on the right, then please click here to Download the FREE QuickTime Player.

 

 
Walnut Industries

Copyright © 2007 Walnut Industries Inc. All rights reserved.